Technical Rider 2007

Cirque le Masque

 

 

Timeschedule

Arrival technicians                              09.00h

Scheduled build                                  8 hours

Scheduled break/load                        2.30 hours

Arrival Cast                                       17.00h

Soundcheck                                      17.30h

Length show         , total                            120 min

Length first half                                  60 min

Length second half                             60 min

Intermission                                      20 min

 

Amount cast/crew

Touring Technicians                            6(1 light, 1 sound, 1 stagemanager, 1   rigger,2 stagehands)

Cast                                                  16 artists

Technicians needed from theatre        4 to unload,build,light,during show,break  and load

Technical facilities

Size stage                                         minimum 7x6m

Orchestra pit                                     not applicable

Ballet floor                                         black

Masking                                            all round

Horizon                                             not applicable

Backdrop                                          not applicable

Set changes                                      not applicable

Power                                               Light: 32 A

                                                        Sound: 16 A

Sound                                                        a. (1) 24 channel mixer (Yamaha, Soundcraft, or Ramsa)

b.  2 CD decks (Denon   D2500 F) or similar

c.  1 sound engineer (rehearsal & show)

d. (4) 1/3 octave EQ’s

e. 1 compressor/limiter

f. Bi-amped or tri-amped house system

g. Minimum 4 sub woofers (Myers, Apogee, or similar)

h. 4 to 8 high /mid range cabinets with flying hardware preferred (Myer, Apogee, or similar)

i. 2 cordless hand-held microphones for rehearsal

j. 1 UHF headset microphone, 2 Yamaha SPX-990, 1 monitor mix, 4 on–stage monitors or side fills                                                                                                                                                                                                  

k. All necessary cable

l. 10 station (2) channel clear com; 2 backstage wings (wireless preferred), 2 follow spots, 5 control board. Assignments: Stage manager - channel 1&2; Backstage-channel 1; Lights - channel 2.

m. All sound equipment must be approved by Cirque Le Masque, Inc.’s technical director.

n. 1 mini disc player

o. Minimum of 4 stage wedge type monitors

Light                                                   a. approximately 100 fixtures to be divided between fixed and moving

b. 2 high power follow spots & operators

c. expendables, including but not limited to, gel & gobos

d. necessary cable and power to execute lighting plot

Special Effects                                             a. Two (2) F150 smoke machines or similar and fans with remote to control area with advance code and alarm approval;(2) DF-50 hazer or equivalent with fans.

b. Dry ice fogger

c. 2 – 3 confetti canons to be used with multicolor confetti or mylar.

Operating light and sound                   From the auditorium(3mx1,5m deep)

Intercoms                                         1x light/sound, 1x stage

Transport                                          Technicians 1 car

                                                        Crew 1 coach bus

Transport set/tech                                      Truck which will be driven by 1 touring technician

Dressing rooms                                 2

Smoke/fire                                        a Hazer will be used

Programme books                             not applicable

 

Rigging Requirements

12 inch or larger box truss, provided by the theater, located approx. 4-7 feet from the downstage edge, trimmed out at 25 feet to the bottom, guyed out and down off of each corner for stabilization (no movement up or downstage or side to side), and in place when we arrive. Theater is responsible for whatever means necessary to stabilize truss.

 

Two offstage points for pulling- one trimmed out at 25 feet and semi secure (no onstage movement) and one to be anchored at or near deck level. The top point may be on the truss if the truss is close enough to the wings. The deck point may be attached to a pin rail, column etc., or a platform with D ring to be loaded with stage weight if necessary ( min. 750 lbs., platform and weight provided by theater). If we travel with a winch, as yet undetermined, this weight will be used to anchor it.

 

Stage weight if necessary, and at least two 20 lb. sandbags

 

Genie lift or other means to access truss/points

 

4 stagehands for pulling, strong bodies with pulling experience preferred

 

Theater to provide means for hanging two upstage drops, one painted and one fiber optic. The painted one is to be used before intermission and the fiber optic after. Best if both are hung pre show and the painted drop is either flown out or lowered in and removed during intermission.